Shandong Chuangxin Building Materials Complete Equipments Co., Ltd

Shandong Chuangxin Building Materials Complete Equipments Co., Ltd

Manufacturer from China
Verified Supplier
10 Years
Home / Products / Magnesium Oxide Board Production Line /

Steel Stucture Magnesium Oxide Board Production Line with Board Thickness Control

Contact Now
Shandong Chuangxin Building Materials Complete Equipments Co., Ltd
Visit Website
City:jinan
Province/State:shandong
Country/Region:china
Contact Person:MrKevin
Contact Now

Steel Stucture Magnesium Oxide Board Production Line with Board Thickness Control

Ask Latest Price
Video Channel
Brand Name :chuangxin
Model Number :XD-1
Certification :CE
Place of Origin :China
MOQ :1 set
Price :negotiation
Payment Terms :L/C, T/T
Supply Ability :50 Sets per year
Delivery Time :30 working days after received your payment
Packaging Details :Packed in carton firstly,and then reinforced with wooden case for outer packing
Product Name :mgo board machine
Warranty :1 years
Automatic grade :semi Automatic
raw material :Mgo,mgcl,fiber glass mesh
Standard :CE 3C
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Steel Stucture Magnesium Oxide Board Production Line with Board Thickness Control

high performance automatic magnesium oxide board production lines

Specifications

AUTOMATIC magnesium oxide board production lines
1 . Stucture Simply,Not Easy to Damage
2 . Less Energy Cost
3 . Advanced tech

Content Design (1)raw material supply

(2)ingredients,mixing machine

(3)molding equipment,auxiliary equipment

(4)maintenance drying equipment

(5)second maintenance area

(6)drying,choosing,cutting,Edge banding machine,packing equipment

(1) raw materials supply

1.1The main raw material of magnesium oxide board :

Magnesium oxide,Magnesium chloride, None-woven fabric, Glass

firber.,Sawdust ,Straws and Perlite

1.2 magnesium oxide warehouse

1.3magnesium chloride solution pool(suggestion uses two dissolve pool and matches mixing equipment)

1.4 pearlite storage(independent) different thickness of the plank use different degree of material.

1.5 sawdust storage(independent) different thickness of the plank uses different degree of material.

Steel Stucture Magnesium Oxide Board Production Line with Board Thickness ControlSteel Stucture Magnesium Oxide Board Production Line with Board Thickness Control

(2) ingredients,mixing machine

2.1 magnesium oxide measuring: every time weight is 120 kilos.

2.2 magnesium chloride solution's measuring : in the pool magnesium chloride solution is transported to the dozen material platform water tank by water pump. Then pass through metering pump to mixing equipment. Each weight about 140 kilogram. Different plank usage will have adjusted.

2.3 pearlite and sawdust volume ratio of 1:1 or so. The volume is about 0.15 cubic respective.

2.4 mixing equipment: every two minutes to complete a feeding,mixing,feeding process. It needs only one sets machine. Middle material mixing machine is used to complete a feeding,mixing,feeding process every four minutes. It needs two sets machine.

(3) molding equipment,auxiliary equipment( molding section)

3.1 molding equipment: outer size is 25*15*15m. Production speed is twenty meters per minute.

3.1.1 board entranceconveyor belt

3.1.2 material molding

3.2 board exit conveyor belt

3.2.3 cutting (cutting separation area: in normal production conditions, non-stop cutting machine need two people)

3.3.1 board thickness control.

3.3.2 speeding up output board

(4) second maintenance equipment,

4.1 On-the-shelf equipment

4.4.1 bracket car outer dimension is 2.7 meters * 1.5 meters. Every car have 25pcs brackets . Bracket outer dimension is 2.5 meters * 1.5 m * 0.1 meters. Every 7 seconds completed a board into brackets. Every 3 minutes complete a replacement empty bracket car process. Need 1 worker of puting bracket,2 workers of carrying bracket ,2 workers as driver of braclet car. (a elevator of 3 meters * 1.5 meters)

Maintenance workshop need 1000 square meters ,which are ventilated in summer, and insulated in winter.

4.2 off-the-shelf equipment

4.2.1 conveying out board and templates from bracket.

4.2.2 separation area, separated board with templated , board complete stacking by labor,and template delivery into cleaning area. (need some flat cars)

Inquiry Cart 0